HOLLOW ROCK LANDFILL
On September 8th, 2023 ETEM acquired the Hollow Rock Landfill from Energy Harbor. The overall footprint of the landfill and surrounding parcels is 935 acres, approximately 2.5 miles west of the Sammis Plant and connected to the Plant by a conveyor system.
HRLF is a Class III Residual Waste Landfill. The permitted disposal area is approximately 142 acres divided into 14 cells. Cells 1-4 are full and capped with intermediate cover. Cell 5 is active. Cells 1-5 cover approximately 55 acres.
ETEM is currently beneficially re-using the gypsum stored at the site.
The Hollow Rock Landfill property offers expansion potential for the Sammis energy and technology redevelopment.